PENGARUH OPERASIONAL PLTD PADA BANDAR UDARA SYAMSUDIN NOOR BANJARBARU AKIBAT PEMUTUSAN TENAGA LISTRIK OLEH PT. PLN DITINJAU DARI SEGI EKONOMI
(1) ATPN Banjarbaru
(2) ATPN Banjarbaru
(*) Corresponding Author
Abstract
Payment of electricity bills at the Syamsudin Noor airport will increase by operating the PLTD at the time of termination of electricity by PT. (PLN). Every month the electricity account must be paid by Syamsudin Noor Airport, but if there is a power cut, the PLTD will operate, so that it will cause additional costs every month at Syamsudin Noor Airport. Additional fees at Syamsudin Noor Banjarbaru Airport in addition to paying electricity bills every month, plus the total operational cost of PLTD (diesel engine) of Rp.15,215,370
Keywords: PLTD (diesel engine), AC generator, total operational cost of PLTD (diesel engine).
Full Text:
PDF (Bahasa Indonesia)DOI: http://dx.doi.org/10.31602/ajst.v4i2.2041
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 AL ULUM JURNAL SAINS DAN TEKNOLOGI
E-ISSN 2477- 4731
Al Ulum: Jurnal Sains dan teknologi = Al Ulum: Jurnal Science and Technology by Islamic University of Kalimantan is licensed under a Creative Commons Attribution 4.0 International License. Based on a work at http://ojs.uniska-bjm.ac.id/index.php/JST.